Florida law now requires most condo buildings 3 stories and up to complete a Structural Integrity Reserve Study (SIRS) — the study that decides how much owners must set aside for roofs, structure, and other major repairs. We watch the state's filing lists for the buildings you're shopping, and email you as soon as a filing appears on the state's published lists, or when a building crosses the deadline still unfiled.
days left to the final deadline — Dec 31, 2026 Under Fla. Stat. §718.112(2)(g), in no event may the study be completed after that date.
Plain English
A Structural Integrity Reserve Study is a reserve study Florida law requires for residential condo buildings of three or more habitable stories. It looks at the parts of the building the association must maintain, checks the reserve fund, and sets a funding schedule so money is actually there when major structural work comes due. It must be done at least every 10 years, by a licensed engineer, architect, certified reserve specialist, or professional reserve analyst.
The study covers eight things:
Why it matters to a buyer: if the study finds reserves don't cover what's coming, the association may have to levy special assessments or borrow to meet the funding schedule — and since Jan 1, 2026, funding reserves per the SIRS is no longer waivable in new budgets. You inherit that schedule the day you close. Source: Florida DBPR — Inspections (SIRS).
The deadlines
Florida has amended this regime in 2023, 2024, 2025, and 2026 — which is exactly why filing status keeps changing, and why a one-time check goes stale.
Initial SIRS due. Associations that existed on or before July 1, 2022 and are unit-owner controlled had to complete their study by this date. Many didn't — see the ~39% figure above.
Reserve funding locks in. For budgets adopted from this point, associations must fund reserves in line with the SIRS schedule. Underfunded buildings feel this as higher fees or assessments.
The hard stop. Buildings coordinating their SIRS with a milestone inspection due in 2026 get until this date — and under §718.112(2)(g)7, in no event may the study be completed after it. A building still unfiled on Jan 1, 2027 is past the last legal deadline.
How the watch works
The Florida DBPR publishes a SIRS Reporting Database — public lists of associations that have submitted a completed SIRS (submissions before July 2025, and July 2025 or later). It's a static list: no search alerts, no notifications, no plain-English explanation. Checking it once isn't enough, because filings keep landing. That's the gap this watch fills.
Send the association or building names and cities from your shortlist — the ones you're touring, bidding on, or already under contract for.
We check the state's published SIRS Reporting Database for your buildings and track any change in their filing status through your shopping season.
As soon as a watched building appears on the state's published lists — or crosses a deadline still unfiled — you get an email with what changed and what it means for special-assessment risk, in plain English.
| Status | What it means | Assessment risk |
|---|---|---|
| Filed | The association has submitted a completed SIRS to DBPR. The study exists, and its funding schedule now drives the reserve budget. Ask for the study itself in your document review — filing alone doesn't tell you the numbers. | Clearer — the plan exists; read it |
| Not filed yet | The building does not appear on either state list. It may still be inside a lawful window (for example, coordinating with a 2026 milestone inspection) — or it may simply be late. Either way, you have no study to price the risk with. | Unknown — price in the uncertainty |
| Past deadline, unfiled | The building crossed Dec 31, 2025 — or, after Dec 31, 2026, the final statutory date — with no filing on record. That's deadline risk on top of reserve risk, and it's the alert that matters most. | Highest — proceed with eyes open |
Note on timing: DBPR says online SIRS submissions appear in the database within one business day; submissions sent by email or mail can take about two weeks. An alert reflects the state's published list, not the association's internal paperwork.
Why buyers specifically
The law protects you: within 45 days of a SIRS being completed, the association must notify unit owners in writing that it's complete and available to review. Milestone inspection summaries must also be distributed to owners.
You don't need this service for a building you already own.
Nobody has to notify you of anything before you sign. You typically receive the association's documents after you're under contract, inside a short document-review / rescission window of about 7 days — while you're also arranging inspections, financing, and insurance.
This watch exists for the months before that window, when you're choosing which buildings are even worth an offer — and it stays on through the window itself.
Honest limits — read this before you pay
Pricing
Condo shopping takes months, and filings land the whole time — so this is priced per season, not per month. No subscription, no auto-renewal.
For buyers actively shopping. Watch every building on your shortlist at once.
Fill in your buildings on the form, then pay on the confirmation screen. Pay with PayPal or any debit or credit card (Visa, Mastercard, American Express, Discover) — no PayPal account needed.
Already under contract and inside your ~7-day review window? Get one building's current filing status, checked against both state lists, with the plain-English readout.
Fill in your building on the form, then pay on the confirmation screen. Pay with PayPal or any debit or credit card (Visa, Mastercard, American Express, Discover) — no PayPal account needed. Don't use the $39 watch form for this.
Get started
Step 1: fill in your buildings on the Google form. Step 2: pay on the confirmation screen. Your watch starts once payment lands.
The form asks for your name, the email address alerts should go to, and up to 5 association or building names with their cities — the ones you're touring, bidding on, or already under contract for.
Watch my buildings — $39 →Fill in your buildings on the form, then pay on the confirmation screen.
Pay with PayPal or any debit or credit card (Visa, Mastercard, American Express, Discover) — no PayPal account needed.
Prefer to pay the main offer directly? Pay $39 with PayPal — but please fill in the Google form first so we know which buildings to watch.
Single-building report — $19
For buyers already under contract. Step 1: fill in the one building on the Google form. Step 2: pay on the confirmation screen (separate from the $39 watch above).
The form asks for your name, the email address your report should go to, and the one association or building name with its city or county.
Get a single-building report — $19 →Fill in your building on the form, then pay on the confirmation screen.
Pay with PayPal or any debit or credit card (Visa, Mastercard, American Express, Discover) — no PayPal account needed.
Prefer to pay directly? Pay $19 with PayPal — but fill in the Google form first so we know which building to check.
Questions
That's the most common result — and it's information, not a dead end. It means no completed SIRS from that association appears in DBPR's published database yet. We'll tell you plainly, note which deadline applies to it, and keep watching: if it files later in your season, you get the alert.
DBPR says online submissions show in the database within one business day (email/mail submissions can take about two weeks to appear). We check the published lists on a regular schedule and email you when your building's status changes on them.
No. Filed means a study was submitted — the database displays it exactly as submitted. It doesn't certify the study is accurate, that reserves are funded, or that the building is safe. The study's own numbers, which you get in your document review, are what tell that story.
They're a separate requirement, and those reports are filed with local enforcement agencies — city and county building departments — not the state. This watch covers SIRS filing status only. Your local building department is the source for a building's milestone report.
One shopping season — through the Dec 31, 2026 final SIRS deadline, which is the date every currently-due building must be filed by. If you're still shopping after that, you can renew for another season.
Probably not for your own building — your association must notify you within 45 days of completing its SIRS, by law. This service is built for buyers (and owners shopping for their next condo) who get no such notice.